Design / Build

Ames Construction's formal partnering and seamless design-build processes ensure single source responsibility throughout all phases of the construction process, from excavation and underground utilities to structure work and site reclamation. This cohesive effort by all members of the design and construction team results in a finished product that meets and often exceeds the goals and objectives of our project owners.

Design-Build

Arizona SR-51

This design-build project included modifications to 12 miles of existing urban freeway in an envi... Read More

Legacy Parkway

This design-build project consisted of the construction of a 14-mile, four lane divided highway. ... Read More

Lost Creek Canyon Pump Station, Pipeline & Water Treatment Plant

This design-build contract included engineering, procurement and construction of a shallow well f... Read More

ROC 52 (TH 52)

Reconstruction of approximately 11 miles of freeway from two lanes in each direction to three. P... Read More

South Access Road

This was an 8.5-mile four-lane design-build highway project. The work included 5,500,000 cubic y... Read More

South Washington County Waste Water Treatment Plant Upgrade

This project consisted of construction and upgrade of a wastewater treatment facility at the Cott... Read More

TH 212

This design-build project includes approximately 11.5 miles of a four lane divided freeway through a... Read More