Search:

West Dedicated Leach Pad - Phase 5

Project Location:

Round Mountain, Nevada

Owner:

Round Mountain Gold Corp.

Synopsis of Work:

Ames Construction was the general contractor for construction of a 6,000,000 square foot leach pad, including 211,000 linear feet of 4 to 36-dia. ADS drain piping, a 12 thick clay-gravel secondary liner, and an 36 thick crushed ore overliner.