Synopsis of work:

Ames performed the remediation of mixed copper tailings and sludge at the Kennecott Utah Copper tailings facility in Utah. The reclamation included excavation, loading and transport of the tailings to a disposal cell. Work also included construction of a three-mile haul road, the stabilization of tailings and placement within the disposal cell.

Click to enlarge any of the photos below:

Excavation, loading and transport of tailings to disposal cell
Excavation, loading and transport of tailings to disposal cell
Work scope included construction of a 3-mile-long haul road