Synopsis of work:

The tailings dam work on this project consisted of excavation and regrading tailings to ensure a slope of 3:1 or less. The work scope included structural, mechanical, piping and liner installation, and constructing access roads.

Ames crews established the borrow area and excavated common, placing it to a depth of two feet over the regraded faces. Four rock armor sizes were designated and produced onsite by drilling and blasting, crushing and screening.

Click to enlarge any of the photos below:

Access roads were constructed and structural, mechanical, piping and liner were installed
Tailings were excavated and regraded to ensure a slope of 3:1 or less
Crews excavated common, placing it to a depth of two feet over the regraded faces