Deer Valley Wastewater Treatment

Perspectives

Ames Construction // Water & Wastewater Treatment // Deer Valley Wastewater Treatment

Project Location: Phoenix, Arizona

Client: City of Phoenix

Synopsis of work:

This three-phased wastewater treatment plant project included both a civil and mechanical package and required the work to be conducted within an operating facility, with minimal scheduled outages during construction.

Ames performed structural demolition and replaced the East plant. This required structural shoring and over-excavation of the East plant area and replacement of the native material by processing it with cement in the form of CSA. The project scope included: excavation, fine grading, CSA processing and backfilling, sitework, utility demolition, installation of temporary utilities, new underground utilities, mechanical piping and new chemical facilities.

Click to enlarge any of the photos below:

Material processing
Work included utilities installation, mechanical piping and new chemical facilities
Structural demolition and replacement of a wastewater treatment facility plant