Transportation

FROM RUNWAYS TO HIGHWAYS, WE GET BIG RESULTS

Industry experience matters, and with our portfolio of infrastructure projects including airports, highways, bridges, and mass transit, it’s easy to see why transportation is a core market for Ames Construction.

From our capabilities in alternative delivery to a knack for early completion, our integrated services and self-performance allow for tighter control of the entire project, keeping it safe, on time and on budget, while maintaining high quality.

Lone Tree Overpass PDB

Using Progressive Design-Build (PDB) delivery to construct a new roadway in Flagstaff, Arizona.

West Davis Corridor Design-Build

16-mile, four-lane divided highway in Davis County, Utah

Lemay Avenue CMGC

Constructed a new bridge and roadway to separate rail and vehicular traffic in Fort Collins, Colorado.

Third Avenue Bridge

Performed critical restoration of historic bridge over the Mississippi River in Minneapolis, Minnesota.

Spaghetti Bowl Xpress

Performed critical reconstruction of the I-80/I-580 interchange in Reno, Nevada.

I-10/Houghton Road DDI

Constructed the first-ever Diverging Diamond Interchange (DDI) in Tucson, Arizona.

San Bernardino Airport

Built a 100-acre air cargo logistics center in San Bernardino, California.

Pinto Creek Bridge

Constructed a new, 695-foot-long structural steel bridge in Tonto National Forest in Arizona.

I-15 Tech Corridor

Widened I-15 in Lehi, Utah, from four to six lanes in each direction.

Idyllwild Emergency Response

Mobilized to repair storm-damaged sections of Highways 74 and 243 in California.

Moorhead Grade Separation

Built an underpass to eliminate the intersection of rail lines and streets in Moorhead, Minnesota.

MSP Terminal Expansion

Performed civil construction for outbound road and plaza reconstruction at MSP International Airport.

SR 347 at UPRR

Reconstructed two miles of SR 347 including a grade separation over a railway in Maricopa, Arizona.

I-35W at I-94

Reconstructed a 2.5-mile segment of I-35W in Minneapolis, Minnesota.

Winona Bridge

Built new bridge upstream from previous crossing in Minnesota’s first-ever CMGC project.

Loop 202

Constructed a 26-mile segment of Loop 202 South Mountain Freeway in Phoenix, Arizona.

SLC International Airport

Working on-site since 2016 in redevelopment of the Salt Lake City International Airport.

St. Croix Crossing

Built a new bridge with a hybrid design spanning the St. Croix River at Stillwater, Minnesota.

Dresbach Bridge

Constructed two concrete box girder bridges over the Mississippi River near La Crosse, Wisconsin.

U.S. 36 Design-Build

Expanded capacity along U.S. 36 between Boulder and Denver, Colorado.

RTD Eagle P3 Commuter Rail

JV partner in the construction of 36 miles of double-track electric commuter rail lines in Denver, Colorado.

11400 South at I-15

Constructed a new Single-Point Urban Interchange (SPUI) in South Jordan, Utah.

Phoenix Sky Harbor

Performed runway replacement and expanded terminal at Sky Harbor Airport in Phoenix, Arizona.

Denver International Airport

Completed 6 major contracts as prime contractor and over 40 as subcontractor in airport construction.